Client

The project consisted of the construction of a new sixth form Suite with dining area within an existing courtyard in the main school grounds, our brief was a complete built, involved all foundations, groundworks external and internal drainage, services infrastructure which included re-routing existing services, mechanical & electrical fit out and all internal and external finishing’s, which included a curved vaulted ceiling in the main area. Full access for the school was maintained through the whole project. 

The fitout involved upgrading and redesigning classrooms, library, or student lounges while the College remained operational. This required careful planning to minimise disruption to ongoing academic activities. Key considerations include scheduling work during off-peak hours, ensuring safety measures for students and staff, and maintaining clear communication about temporary changes. Balancing construction work with the daily needs of the college ensures that the project enhanced the college environment without affecting the learning experience.